With in depth requirments, we can also create your specific made solution. The new goods consist of a collection of large-tech and large top quality chains and sprockets and gears, this sort of as chains and gearboxes for agricultural machineries, metallurgical chains, escalator phase-chains, large-velocity tooth chains, timing chains, self-lubrication chains, between which have variety higher velocity tooth chain for car department dynamic box and aerial chains fill in the blanks of chain in China. Great attention has been paid out on environmental safety and strength preserving. one liter quickly blow molding EPTT 6000BPH
EPT EPTT EPTTry Co time period comma Ltd interval is a specialist EPTTrprise which integrates creating comma manufacturing and providing the flip-essential venture to our partners period of time
For a long time comma EPT has dedicated herself to the EPTT EPTTry of water comma EPTTrage comma daily use chemical and edible oil period We have provided in excess of 70 nations around the world and locations with the adhering to goods colon air compressors comma PET blowing EPTT comma h2o remedy comma washing-filling-capping assembly line and barreled consuming water assembly line period of time
two time period Advantages colon
2 period1 EPT pace with reasonable framework colon
The EPT linkage cam can complete mildew-opening comma mildew-locking and bottom mould-elevating in one movement comma the blowing interval is drastically reduced to 2 seconds period of time
The linkage cam is EPTTly EPTn by one servo motor comma this naturally simplify the blowing EPTT framework comma which make it practical to maintain and no want for large lubrication work period of time
2 period2 Considerably less heating oven comma little electrical energy usage
The preforms length in the heating oven is only 38 period1mm comma which indicates more preforms can be set into the oven when compared with the standard blowing EPTT period The heating performance is mostly enhanced comma and as a end result comma it will save more than 30 percnt electrical power usage than the standard blowing EPTT period
two period3 Stably running
The EPTT adopts modularized design concept comma it has compact and realistic construction comma it decreases the failure charge from the simple design angle interval FG4 does not need the reduced air compressor period of time
three Element specification of FG-four PET bottle blowing EPTT
Main Parameter | ||||
Model | FG-four | |||
Ability | Count on bottle style | 5500-7200PCS solH | ||
Relevant Preform | Peak | lt330mm | ||
Neck | 20mm-25mm | |||
Applicable Bottle | Neck | twenty-25mm | ||
Volume | Max period2Liter | |||
Peak | Max period328mm | |||
Diameter | Max period105mm | |||
Electric powered consumption | Set up EPTT | 51kw | ||
EPT oven powder | 46kw | |||
EPT Oven working EPTT | 26kw | |||
Air intake | Strain | 4m3 solmin four period0MPa | ||
Capacity | 4m3 solmin four period0MPa | |||
Mildew Chiller | Pressure | 4-6Bar | ||
Temperature | six-thirteen ordmC | |||
Circulation | 45L solmin | |||
Oven Chiller | Stress | 4-6Bar | ||
Temperature | six-13 ordmC | |||
Movement | 26L solmin | |||
EPTT Dimension | L astW astH | 3900 ast900 ast2500mm | ||
Fat | 3500kg | |||
Capacity colon 5000-5500BPH lparbased on 1L rpar | ||||
Max period of time Volume colon 2 Litter Whole Size colon Blowing Principal EPTT colon 3 period6 ast1 period3 ast2 period3m Sorting EPTT colon2 ast1 period5 ast1 period5m solLoader colon3 ast1 ast1 period5m |
||||
Primary electrics | ||||
EPT part amp Cylinder | EPT | GERMAN EPT | ||
Electric powered element | PLC | JAPAN EPT | ||
Servo Method | JAPAN Panasonic | |||
Frequency inverter | JAPAN EPT | |||
Operating system | JAPAN EPT | |||
Contact EPT | JAPAN EPT | |||
Blowing | EPT | JAPAN Parker | ||
One particular-way EPT | GERMAN EPT | |||
Throttle EPT | GERMAN EPT | |||
Lowering EPT | GERMAN DURAY | |||
Notice colon All the EPT elements adopts CE commaUL commaCCC approved intercontinental EPTd substantial-tech product |
4 period Our Providers
one gt The EPTT will be tested and checked at our workshop just before supply period
2 gtAfter a single year comma we will supply components are provided only one the EPT price tag period
three gt Totally free EPT Elements colon EPTT instrument comma EPT comma Stretching cylinEPTTseal ring comma EPT-adjustment wrench comma Furnace temperature table comma Furnace heating tube and other relative susceptible portion interval
4 gtFree production EPT and procedure configuration period of time
five gt We can help you to layout the item line comma workshop and offer switch-essential task time period
six gtInstallation colon Authorities apos staff to consumer aposs country soon after affirmation that the merchandise arrived in website and civil works completed get prepared for installation period of time Cash for vacation need to have to be payed by shopper and added wage dollar100 solday during the engineer aposs journey period of time
7 gtWarranty colon One calendar year from the date of Set up or acceptance of the Plant whichever will come very first