makes certain the security and consistency of the key purpose of factors. Our solution range includes all types of helical gear, spur gear, bevel equipment, gear rack, worm gear, sprockets,chains, bearings. We inspect every single piece of bearing by ourselves just before supply. Medium Responsibility Rack
Medium Duty Rack is a butterfly gap shelf locking hole framework, with simple set up, no toughness, to put strain on the products made normal fastened features to adjust the pitch 50MM storey primary and auXiHu (West EPT) Dis.liary frame unlimited connections, enhance the firmness of the shelf saving investment. EPT the use of P-kind pipe, increasing the shelf robustness and stability.
Features:
one, column of steel EPTT profiles, butterfly gap (dovetail properly) on the beam and Kits reasonable plug, make dis-assembly simpler, butterfly hole to 50mm as a device, the heigEPTT can be modified up and down any relationship. Laminates are cold-rolled metal, laminates subsequent method can be place-rolled tremendous-kind ribs to single bearing can 150-500KG.
2, shelf unit duration is typically no much more than 2m, width of not much more than 1m, heigEPTT EPTTly considerably less than 3m. If the shelf unit length less than 2m, layer contained considerably less than 500kg.
3, wide butterfly gap shelf programs, not only can do warehouse storage use can also be employed at the mall display. Desire for warehouse size can be EPT according to the user the rigEPTT shelf, we have a specialist plan designer.
Company Information
Model | Medium Duty Rack P00006# | |||||||||
Size | A) 1500mm EPTT | B) 1800mm EPTT | C) 2000mm EPTT | D) 2440mm EPTT | ||||||
A) 300mm wide | B) 450mm vast | C) 600mm wide | D) 750mm extensive | |||||||
A) 1500mm large | B) 1800mm substantial | C) 2000mm large | D) 2500mm extensive | |||||||
EPTs Optional | A) EPTT Steel Q235A utilized for normal temperature storage situation | |||||||||
B) EPTT Metal Q235B utilized for cold storage area | ||||||||||
C) EPTal safety powEPTTfor surface area therapy–powEPTTcoating | ||||||||||
Craft-work | A) hole-punching | B) cold rolling | C) welding | D) powEPTTcoating | ||||||
Framework | A) bolted construction | B) welded framework | ||||||||
EPTT | A) as to our stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd product | B) according to customer’s requests | ||||||||
Pack model | A) stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd export EPTT | B) in accordance to customer’s requests | ||||||||
Bundle substance | A) clear and dust-evidence poly-sheet | |||||||||
B) challenging carton paper | ||||||||||
C) EPTT and slim plywood bar | ||||||||||
D) plywood pallet metal and plastic straps | ||||||||||
E) air bag employed when loading container | ||||||||||
MOQ | 5-10 sets the product is subject matter to your demands | |||||||||
Payment | A) T/T | B) LC | C) Paypal or Western EPT | |||||||
Guarantee | A) a single 12 months towards production defect | |||||||||
B) offer you lifetime session on issues transpired | ||||||||||
EPTtity | A) 20′ container | B) 40′ container | C) a sample buy | |||||||
17500kgs | 26000kgs | one established | ||||||||
Supply time | In 15 times | In 20 times | In 7 days | |||||||
Note | All racks can be EPT |
EPTT information
Container Loading
FAQ
a: May possibly I know the status of my buy?
We will deliver you images or online video and aid you to update.
b: Fast manufacturing time
For Regular orders, we will guarantee to generate inside fifteen workdays.
As a manufactory, we can essure the shipping time in accordance to the official deal.
c: What is shipping and delivery occasions?
Normally, supply time is in twenty workdays.
d: What is the term of payment?
T/T: thirty% deposit in EPT after verified order,
70% harmony payment just before shipment
WESTERN EPT, PAYPAL
Speak to Data