We also can layout and make non-common products to satisfy customers’ unique needs. Owing to our broad merchandise range and prosperous activities in this business, we have obtained the believe in of buyers globally. Medium Responsibility Rack
Medium Responsibility Rack is a butterfly hole shelf locking hole framework, with straightforward installation, no energy, to place pressure on the products created normal fixed features to adjust the pitch 50MM storey primary and auXiHu (West EPT) Dis.liary frame unlimited connections, boost the firmness of the shelf saving expense. EPT the use of P-type pipe, increasing the shelf robustness and stability.
Attributes:
1, column of steel EPTT profiles, butterfly hole (dovetail nicely) on the beam and Kits realistic plug, make dis-assembly easier, butterfly gap to 50mm as a unit, the heigEPTT can be altered up and down any link. Laminates are chilly-rolled metal, laminates following method can be location-rolled super-kind ribs to solitary bearing can one hundred fifty-500KG.
2, shelf device length is typically no far more than 2m, width of not much more than 1m, heigEPTT EPTTly considerably less than 3m. If the shelf device duration significantly less than 2m, layer contained significantly less than 500kg.
three, broad butterfly gap shelf apps, not only can do warehouse storage use can also be utilized at the mall display. Desire for warehouse dimension can be EPT according to the user the rigEPTT shelf, we have a skilled program designer.
Enterprise Info
Product | Medium Duty Rack P00006# | |||||||||
Dimension | A) 1500mm EPTT | B) 1800mm EPTT | C) 2000mm EPTT | D) 2440mm EPTT | ||||||
A) 300mm vast | B) 450mm vast | C) 600mm vast | D) 750mm broad | |||||||
A) 1500mm high | B) 1800mm large | C) 2000mm high | D) 2500mm vast | |||||||
EPTs Optional | A) EPTT Steel Q235A utilized for regular temperature storage situation | |||||||||
B) EPTT Steel Q235B utilized for cold storage place | ||||||||||
C) EPTal safety powEPTTfor floor treatment method–powEPTTcoating | ||||||||||
Craft-perform | A) gap-punching | B) cold rolling | C) welding | D) powEPTTcoating | ||||||
Framework | A) bolted framework | B) welded framework | ||||||||
EPTT | A) as to our stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd model | B) according to customer’s requests | ||||||||
Pack product | A) stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd export EPTT | B) in accordance to customer’s requests | ||||||||
Package material | A) clear and dust-proof poly-sheet | |||||||||
B) difficult carton paper | ||||||||||
C) EPTT and slender plywood bar | ||||||||||
D) plywood pallet metal and plastic straps | ||||||||||
E) air bag employed when loading container | ||||||||||
MOQ | 5-ten sets the model is subject to your needs | |||||||||
Payment | A) T/T | B) LC | C) Paypal or Western EPT | |||||||
Guarantee | A) one 12 months towards production defect | |||||||||
B) offer life span consultation on difficulties occurred | ||||||||||
EPTtity | A) 20′ container | B) 40′ container | C) a sample get | |||||||
17500kgs | 26000kgs | one established | ||||||||
Shipping and delivery time | In fifteen days | In twenty days | In seven days | |||||||
Notice | All racks can be EPT |
EPTT information
Container Loading
FAQ
a: May I know the position of my buy?
We will send you pictures or video clip and support you to update.
b: Quick production time
For Regular orders, we will assure to generate inside of 15 workdays.
As a manufactory, we can essure the supply time according to the official contract.
c: What is shipping moments?
Generally, supply time is inside 20 workdays.
d: What is the term of payment?
T/T: 30% deposit in EPT soon after verified buy,
70% stability payment before cargo
WESTERN EPT, PAYPAL
Make contact with Info